Posts in Commercial
Golden Gate Petroleum - USA Parkway

This tenant improvement expanded the existing convenience store into the adjacent casino space and included construction of a new cooler/freezer as part of the interior remodel. The Lepori team had to keep the existing store and sandwich shop operational while working around the customers in order to update all interior finishes, install additional cabinetry and provide the additional market space needed at this busy location.

Read More
Golden Gate Petroleum - Sun Valley

The Lepori team demoed the existing building and fuel canopies to make way for a brand new convenience store including new fuel canopies, a new fuel system, below-grade storage tanks, and utility provisions for a future retail pad located on the same parcel. To keep everything consistent our client wanted this location to resemble the remodel that was done in Carson City.

Read More
Pacific Medical Building Common Area Upgrades

Working in a fully occupied four-story medical building, the Lepori team installed new finishes in the common area lobbies, corridors and restrooms of each floor working off-hours and weekends as needed to ensure work did not impact tenants. Tasks consisted of full flooring replacement, upgrades to all lighting fixtures, replacement of acoustical ceiling tiles, painting and installation of new wall covering to existing elevator walls. The main stairway corridor was also stripped to the existing concrete and steel structure where the concrete was then stained, and the metal components painted.

Read More
Truckee Tahoe Lumber, Sparks Distribution Center

The Lepori team designed and constructed improvements needed to bring the ‘60s era building up to code and structural integrity. Key challenges included making it ADA compliant, installing racking for the center’s lumber and tenant improvements to a showroom and door shop.

Read More
Washoe Wellness Cultivation

Using design-build delivery, the Lepori team is delivering another 20,000 sq ft of cultivation facilities. We demolished existing walls, stairs, and restrooms to create a main floor with 10 flowering rooms and facilities for packing, tissue culture, humidors, and vegetative labs. An upper floor includes additional support facilities.

Read More